![YASKAWA PVI 50TL Installation And Operation Manual Download Page 93](http://html1.mh-extra.com/html/yaskawa/pvi-50tl/pvi-50tl_installation-and-operation-manual_907564093.webp)
DOCR-070645-E
Page 93 of 102
Figure 6.3 - Remove the Screws on Both Sides
c.) Use a No. 10 Hex wrench to remove the 4 screws between the main section and
the wiring box. Lift up the main section and disconnect from the wiring box.
Figure 6.4 - Disconnect the Main Section from the Wiring Box
d.) Use a No.2 Phillips head screwdriver to remove the 2 screws on the left side of the
wiring box, and take off the cover board. Put the board on the connector of wiring
box.
Torque value: 10 in-lbs (1.2N.m)
Figure 6.5 - Install the Cover Board on the Connector of the Wiring Box