![YASKAWA PVI 50TL Installation And Operation Manual Download Page 82](http://html1.mh-extra.com/html/yaskawa/pvi-50tl/pvi-50tl_installation-and-operation-manual_907564082.webp)
DOCR-070645-E
Page 82 of 102
Current Error
P1/1
Date
Error
2015/10/22 12:20:08
ArcboardErr
2015/10/22 12:20:08
2015/10/22 12:20:08
Fault0040
2015/10/22 12:20:08
2015/10/22 12:20:08
Time
Fault0040
Fault0040
Fault0040
Figure 5.4 - Fault Indication Interface
5.4 Grid-Tied Power Generation
PVI 50/60TL series inverter has an automatic grid-tied power generation process. It
will check whether AC power grid meets the conditions for grid-tied power generation
constantly and test whether the PV array has enough energy. After all conditions are
met, the inverter will enter grid-tied power generation mode. While in the grid-tied
power generation mode, the inverter can detect the power grid at all times, and also
keep the photovoltaic array output in maximum power point tracking (MPPT) mode.
In case of any abnormity, the inverter will enter the protection program immediately.
In low light conditions when the PV power is not enough to keep the inverter in
operation, the inverter will enter standby mode. When the voltage of the PV array
changes and becomes stable and higher than the required set value, the inverter will
attempt to start grid-tied power generation again.
WARNING:
All installation and wiring connections should be performed by qualified
technical personnel. Disconnect the inverter from PV modules and the AC
supply before performing maintenance.
Do not work on the inverter until at least 5 minutes after disconnecting
all sources of DC and AC.
Toutes les installations et les connexions de câblage doivent être
effectuées
uniquement
par
le
personnel
technique
qualifié.
Débrancher l'onduleur de modules photovoltaiques et le grid électrique
avant l'entretien et la marche de l'équipement.
Ne pas utiliser ou entretenir l'onduleur jusqu'à au moins 5 minutes après
avoir débranché toutes les sources du côté C.C. et C.A.