13
Model
Code in the
graph 8
1000W
2000W
3000W
5000W
10KW
20KW
Ground depth(m)
( D1)
1.2
1.5
1.5
1.6
2.0
3.0
Ground diameter(m)
( C1)
1.0
1.0
1.2
1.5
1.8
2.5
Burial depth of cotter bolt (m)
( D2)
0.8
1.2
1.2
1.2
1.6
2.0
Layout diameter of cotter bolt
(mm)
( C2)
450
600
600
700
1000
1200
Specification of cotter bolt
( T)
M18
M18
M20
M24
M24
M30
Quantity of cotter bolt
( N)
12
12
12
12
16
16
Table 2
Step 3: Assembly of tower and generator
Please refer to the installation specification of guyed tower (Step 4)
Step 4: Hoisting the tower
A hoist is needed while installing the guyed tower, which will be proceeded by professional
personnel. Non-working people should be far away from the site when hoisting.
1. Utilized by supporter on the upper side of pole and hoist gradually.
2. When the tower has been erected, face the open hole on tower base to the cotter bolt and
screw down the bolt nut.
Configuration Specification of Batteries
1. Batteries should be placed inside buildings under dry and constant temperature. After finalizing
the quantity of batteries in series, it is necessary to have a design to place the batteries,
controller and inverter.
2. Connect the batteries in series. The concrete way is to connect the anode of first battery to
cathode of the second one.
3. Make the joints greased. Install the fuse on the positive electrode of battery. The distance of
conducting wire between batteries and controller should be less than 3m.