8
Step 4 Assembly of the tower and wind turbine
1. First, insert the main section of tower into base, then insert the axis pin into base and insert the
split pin. (As shown in the graph 4)
Graph 4
2. Connect each section of tower one by one, place the tower on the supporting stand after
assembly.
3. Rip the generator and dogvane cables into the tower, and elicit the cables from the main
section of tower, near the tail edge.
4. Fix the running flange and tower flange by bolts. Hoist it by equipments such as pulleys, chain
block etc. Pay attention that the generator axis should be faced upward in order to install the
blades.
5. Install the blades and cover the pressure pad (300W wind turbine having no pressure pad), then
screw the bolts.
Keep the balance of blades when install them. First, do not screw the bolts too tight, adjusting the
distance between two blades’ tips to be equal after screwing all the bolts. (as shown in the graph