5
2. PRE-OPERATION PROCEDURES
Installation Precautions & Preparations
3. Choose an appropriate installation site.
DO NOT install unit:
where flammable or corrosive gases/fumes will be generated.
where ambient temperature will exceed 35ºC, will fall below 5ºC or will fluctuate.
in excessively humid or dusty locations.
where there is constant vibration.
where power supply is erratic.
in direct sunlight or outdoors.
where there is no exhaust/ventilation hood.
Install BA series unit in a location with sufficient space, as specified as below.
4. DO NOT disassemble or modify.
Never attempt to disassemble or modify BA units. Doing so may cause equipment malfunction,
fire or electric shock.
5. Place on a flat surface.
Install unit on a flat and level surface. Failure to do so may cause abnormal vibrations or noise,
resulting in possible complications and/or malfunction. Level off unit, if needed, using
adjustable feet.
Summary of Contents for BA300
Page 2: ......