
ENG
5-47
2. Install:
8
clutch carrier nut
1
90 Nm (9.0 m • kg, 65.1 ft • lb)
NOTE:
While holding the clutch carrier with the rotor
holding tool
2
, tighten the clutch carrier nut with
the locknut wrench
3
.
Rotor holding tool
90890-01235
Locknut wrench
90890-01348 (YM-01348)
3. Install:
8
clutch housing
1
8
secondary sheave nut
2
60 Nm (6.0 m • kg, 43.4 ft • lb)
NOTE:
Tighten the secondary sheave nut with the
sheave holder
3
.
Sheave holder
90890-01701 (YS-01880-A)
4.
Position:
8
V-belt
1
NOTE:
Position the V-belt in the primary sheave
2
(when the pulley is at its widest position) and in
the secondary sheave
3
(when the pulley is at
its narrowest position), and make sure the V-
belt is tight.
2
3
1
3
2
1
2
1 3
BELT DRIVE
T
R
.
.
T
R
.
.