FRAME
11. Install:
• Fender
1
10. Install:
• Brake caliper
• Fastener (brake hose)
• Plastic belt
See Section "INSTALLATION - FRONT
FORK."
9. Tighten:
• Lower and upper board screws.
Screw (lower board):
20 N.m (2.0 kgf.m; 14 ft.lb)
Screw (upper board):
20 N.m (2.0 kgf.m; 14.4 ft.lb)
Screws (fender):
7 N.m (0.7 kgf.m; 5.0 ft.lb)
6-52
14. Install:
• Fuel tank
See Section "SEAT, FUEL TANK AND
COVERS," CHAPTER 3.
13. Install:
• Handle-bars
See Section "INSTALLATION - HANDLE-
BARS."
12. Install:
• Front wheel
See Section "INSTALLATION - FRONT
WHEEL."
Axle nut:
80 N.m (8.0 kgf.m; 57.9 ft.lb)
STEERING COLUMN AND HANDLE-BARS
1
Screw (brake caliper):
40 N.m (4.0 kgf.m; 28.9 ft.lb)
Screw (fastener):
7 N.m (0.7 kgf.m; 5.1 ft.lb)
Screw (handle-bars):
23 N.m (2.3 kgf.m; 16.6 ft.lb)
Screw (master cylinder support):
7 N.m (0.7 kgf.m; 5.1 ft.lb)