3 - 13
INSP
ADJ
VALVE CLEARANCE INSPECTION AND ADJUSTMENT
●
Measure the valve clearance.
●
If the clearance is incorrect, repeat above
steps until specified clearance is obtained.
6. Install:
●
O-ring
1
●
Crankshaft end accessing screw
2
●
Timing mark accessing screw
3
NOTE:
Apply the lithium soap base grease on the O-
rings.
New
T
R
.
.
7 Nm (0.7 m · kg, 5.1 ft · lb)
T
R
.
.
7 Nm (0.7 m · kg, 5.1 ft · lb)
7. Install:
●
O-ring
1
●
Exhaust tappet cover
2
●
Intake tappet cover
3
NOTE:
Apply the lithium soap base grease on the O-
rings.
8. Install:
●
Spark plug
●
Fuel tank
●
Seat
Refer to “SEAT, FUEL TANK AND
SIDE COVERS” section in the CHAP-
TER 4.
New
T
R
.
.
18 Nm (1.8 m · kg, 13 ft · lb)
T
R
.
.
18 Nm (1.8 m · kg, 13 ft · lb)
T
R
.
.
13 Nm (1.3 m · kg, 9.4 ft · lb)
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
T
R
.
.
7 Nm (0.7 m · kg, 5.1 ft · lb)
Summary of Contents for TT-R125(T)
Page 49: ...GEN INFO MEMO...
Page 179: ...INSP ADJ MEMO...
Page 571: ...ELEC MEMO...
Page 585: ...ELEC MEMO...
Page 605: ...ELEC MEMO...
Page 608: ......
Page 609: ......
Page 610: ...PRINTED IN BRAZIL 06 2004 1000 GYL E F G YAMAHA MOTOR DA AMAZ NIA LTDA...