–35–
SECONDARY SHEAVE
POWR
TR
NOTE:
ASSEMBLY
1. Install:
Secondary sheave spring
1
Hook the end of the secondary sheave spring
onto the spring holes in the fixed sheave and in
the spring seat.
Standard spring position:
2-6 (600)
3-3 (700)
Installation steps:
Attach the sheave compressor.
Turn the sliding sheave counterclockwise to
the specified angle
a
.
Hold the sliding sheave and fixed sheave in
this position.
Standard twist angle
a
:
80
(600)
60
(700)
a
= (sheave side hole spring seat
side hole number)
10
Turn in the sheave compressor screw so that
the spring seat engages with the fixed sheave.
Summary of Contents for SX500D
Page 1: ...SUPPLEMENTARY SERVICE MANUAL ...
Page 85: ... 81 CABLE ROUTING SPEC CABLE ROUTING 500 ...
Page 87: ... 83 CABLE ROUTING SPEC ...
Page 89: ... 85 CABLE ROUTING SPEC ...
Page 91: ... 87 CABLE ROUTING SPEC ...
Page 93: ... 89 CABLE ROUTING SPEC ...
Page 95: ... 91 CABLE ROUTING SPEC ...
Page 97: ... 93 CABLE ROUTING SPEC CABLE ROUTING 600 700 ...
Page 99: ... 95 CABLE ROUTING SPEC ...
Page 101: ... 97 CABLE ROUTING SPEC ...
Page 103: ... 99 CABLE ROUTING SPEC ...
Page 105: ... 101 CABLE ROUTING SPEC ...
Page 107: ... 103 CABLE ROUTING SPEC ...
Page 109: ... 105 CABLE ROUTING SPEC ...
Page 112: ...WIRING DIAGRAM ...
Page 114: ...WIRING DIAGRAM ...