PRIMARY SHEAVE AND DRIVE V-BELT
POWR
TR
Order
Job name / Part name
Q’ty
Remarks
Primary sheave disassembly
Primary sheave cap
Primary sheave spring
Collars
Rollers
Washers
Collars
Weights
Washers
Fixed sheave
Stopper
Sliding sheave
Bushing
Spider
Sliders
1
1
3
3
6
3
3
6
1
1
1
1
1
6
Disassemble the parts in the order below.
For assembly, reverse the disassembly
procedure.
6 Nm (0.6 m
S
kg, 4.3 ft
S
lb)
A :
14 Nm (1.4 m
S
kg, 10 ft
S
lb)
B :
200 Nm (20 m
S
kg, 145 ft
S
lb)
C :
1
10
2
3
4
5
6
7
8
9
11
12
13
14
S
Clean the threads.
S
Apply LOCTITE
R
# 648 as illustrated in . And then tighten the spider.
(The spider must turn counter clockwise to be tighten.)
D
E
a
b
16mm (0.63 in)
30
35mm
(1.18
1.38 in)
Summary of Contents for SX500D
Page 1: ...SUPPLEMENTARY SERVICE MANUAL ...
Page 85: ... 81 CABLE ROUTING SPEC CABLE ROUTING 500 ...
Page 87: ... 83 CABLE ROUTING SPEC ...
Page 89: ... 85 CABLE ROUTING SPEC ...
Page 91: ... 87 CABLE ROUTING SPEC ...
Page 93: ... 89 CABLE ROUTING SPEC ...
Page 95: ... 91 CABLE ROUTING SPEC ...
Page 97: ... 93 CABLE ROUTING SPEC CABLE ROUTING 600 700 ...
Page 99: ... 95 CABLE ROUTING SPEC ...
Page 101: ... 97 CABLE ROUTING SPEC ...
Page 103: ... 99 CABLE ROUTING SPEC ...
Page 105: ... 101 CABLE ROUTING SPEC ...
Page 107: ... 103 CABLE ROUTING SPEC ...
Page 109: ... 105 CABLE ROUTING SPEC ...
Page 112: ...WIRING DIAGRAM ...
Page 114: ...WIRING DIAGRAM ...