–12–
COOLING SYSTEM/ENGINE IDLE SPEED ADJUSTMENT
INSP
ADJ
NOTE:
16. Inspect:
Cooling system
Decrease of pressure(leaks)
Repair as re-
quired.
Inspection steps:
Attach the cooling system tester
1
(90890-01325, YU-24460-01) to the coolant
filler
2
.
Apply 100 kPa (1.0 kg / cm
2
, 14 psi).
Measure the pressure with gauge.
2E101
ENGINE IDLE SPEED ADJUSTMENT (500)
1. Adjust:
Engine idle speed
Adjustment steps:
Start the engine and let warm up.
Turn the throttle stop screw
1
in or out to ad-
just the engine idle speed.
Turning in
Idle speed increases.
Turning out
Idle speed decreases.
Engine idle speed:
1,600
"
100 r / min
(1,500
X
1,700 r/min)
After adjusting the engine idle speed, the
throttle cable free play should be adjusted.
Summary of Contents for SX500D
Page 1: ...SUPPLEMENTARY SERVICE MANUAL ...
Page 85: ... 81 CABLE ROUTING SPEC CABLE ROUTING 500 ...
Page 87: ... 83 CABLE ROUTING SPEC ...
Page 89: ... 85 CABLE ROUTING SPEC ...
Page 91: ... 87 CABLE ROUTING SPEC ...
Page 93: ... 89 CABLE ROUTING SPEC ...
Page 95: ... 91 CABLE ROUTING SPEC ...
Page 97: ... 93 CABLE ROUTING SPEC CABLE ROUTING 600 700 ...
Page 99: ... 95 CABLE ROUTING SPEC ...
Page 101: ... 97 CABLE ROUTING SPEC ...
Page 103: ... 99 CABLE ROUTING SPEC ...
Page 105: ... 101 CABLE ROUTING SPEC ...
Page 107: ... 103 CABLE ROUTING SPEC ...
Page 109: ... 105 CABLE ROUTING SPEC ...
Page 112: ...WIRING DIAGRAM ...
Page 114: ...WIRING DIAGRAM ...