CABLE ROUTING (FJR1300A)
2-48
1. O
2
sensor lead
2. Engine idling speed adjusting cable
3. Starter motor lead
4. Air deflector
5. Wire harness
6. Spark plug lead #4
7. Spark plug lead #1
8. Cylinders-#1/#4 ignition coil
9. Cylinders-#2/#3 ignition coil
10. Starter relay
11. Starter relay lead
12. Fuse box 2
13. Negative battery lead
14. Brake hose (front brake master cylinder to brake
pipe/lower joint assembly)
15. Right handlebar switch lead
16. Throttle cable (accelerator cable)
17. Throttle cable (decelerator cable)
18. Battery stay
19. Battery
20. Positive battery lead
21. Positive battery lead coupler
22. Front cowling wire harness
23. Right horn (high) leads
24. Front right turn signal light lead
25. Right radiator fan motor lead
26. Ground lead coupler
27. Brake hose (brake pipe/upper joint assembly to
right front brake caliper)
28. Brake hose (metering valve to right front brake
caliper)
29. Right horn (high)
30. Right horn (high) connectors
31. Water pump breather hose
32. Right radiator fan
33. Crankshaft position sensor lead
34. Spark plug leads
35. Ignition coil primary leads
36. Fuse box leads
A. Route the O
2
sensor lead to the inside of the
engine idling speed adjusting cable.
B. Make sure that the wire harness and spark plug
leads are positioned in the indentation on the right
side of the air deflector.
C. Route the spark plug leads to the inside of the
battery stay pipe.
D. Fasten the negative battery lead at the blue tape
and the starter motor lead to the battery box with a
plastic locking tie. Face the end of the plastic
locking tie downward. Do not cut off the excess
end of the plastic locking tie.
E. Fasten the negative battery lead and starter motor
lead to the battery box with a plastic locking tie.
Face the end of the plastic locking tie rearward. Do
not cut off the excess end of the plastic locking tie.
F. Route the positive battery lead between the
battery stay and the battery box.
G. To front cowling wire harness
H. Align the rear end of the right radiator fan motor
coupler with the tape on the wire harness as
shown in the illustration.
I.
Fasten the wire harness, right horn (high) leads,
and right radiator fan motor lead with a plastic
locking tie, making sure to install the tie on the fan
motor lead’s protective sleeve. Face the end of the
plastic locking tie outward. Do not cut off the
excess end of the plastic locking tie.
J. To front right turn signal light
K. Fasten the wire harness, right radiator fan motor
lead, negative battery lead, and starter motor lead
to the battery stay with a plastic locking tie, making
sure to install the tie on the fan motor lead’s
protective sleeve and to position the tie in front of
the air deflector. Face the end of the plastic locking
tie outward, and then cut off the excess end of the
tie.
L. Fasten the wire harness to the battery stay with a
plastic locking tie. Face the end of the plastic
locking tie upward, and then cut off the excess end
of the tie.
M. Fasten the negative battery lead at the blue tape,
starter motor lead, and water pump breather hose
with a plastic locking tie, making sure to install the
tie around the end of the hose’s protective sleeve,
and then cut off the excess end of the tie. Do not
kink the water pump breather hose and do not face
the end of the plastic locking tie downward.
N. Route the wire harness to the outside of the spark
plug leads.
O. Route the ignition coil primary leads to the inside
of the fuse box leads.
P. Outside of frame
Q. Position the plastic locking tie to the rear of the
bend in the battery stay.
Summary of Contents for FJR1300A(X)
Page 1: ...2008 SERVICE MANUAL FJR1300A X FJR1300AS X 3P6 28197 E2 ...
Page 6: ......
Page 8: ......
Page 50: ...SPECIAL TOOLS 1 41 ...
Page 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Page 84: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 3 2 ...
Page 85: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 34 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Page 86: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 6 5 4 3 2 1 ...
Page 88: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 1 2 3 4 5 6 7 8 9 ...
Page 90: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 4 5 3 2 1 9 8 6 7 ...
Page 94: ...COOLING SYSTEM DIAGRAMS 2 43 A A 7 1 2 3 4 5 5 7 8 6 8 9 10 11 12 ...
Page 100: ...CABLE ROUTING FJR1300A 2 49 2 3 4 5 6 7 8 9 11 10 12 13 14 15 16 A B C D E F 1 1 ...
Page 102: ...CABLE ROUTING FJR1300A 2 51 1 2 3 4 5 6 7 8 A B C D E 9 10 11 12 13 ...
Page 110: ...CABLE ROUTING FJR1300A 2 59 1 2 3 4 A B B C D E ...
Page 120: ...CABLE ROUTING FJR1300AS 2 69 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 A B C E D F 1 1 H 10 18 G ...
Page 122: ...CABLE ROUTING FJR1300AS 2 71 1 2 3 4 5 6 7 8 A B C D E 9 10 11 12 13 ...
Page 130: ...CABLE ROUTING FJR1300AS 2 79 1 4 2 5 6 A B C D D E 3 F G ...
Page 136: ...CABLE ROUTING FJR1300AS 2 85 ...
Page 139: ......
Page 198: ...GENERAL CHASSIS 4 11 b a 1 2 ...
Page 326: ...CAMSHAFTS 5 21 ...
Page 420: ...CONNECTING RODS AND PISTONS 5 115 ...
Page 458: ...WATER PUMP 6 15 ...
Page 468: ...AIR INDUCTION SYSTEM 7 9 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 1 1 1 1 2 2 5 2 3 3 4 7 8 6 ...
Page 477: ......
Page 489: ...IGNITION SYSTEM 8 12 ...
Page 505: ...ELECTRIC STARTING SYSTEM 8 28 ...
Page 507: ...CHARGING SYSTEM 8 30 2 Rectifier regulator 3 AC magneto 8 Main fuse 9 Battery ...
Page 509: ...CHARGING SYSTEM 8 32 ...
Page 533: ...COOLING SYSTEM 8 56 ...
Page 581: ...FUEL PUMP SYSTEM 8 104 ...
Page 593: ...ACCESSORY BOX SYSTEM 8 116 ...
Page 604: ...IMMOBILIZER SYSTEM 8 127 a Light on b Light off ...
Page 605: ...IMMOBILIZER SYSTEM 8 128 ...
Page 615: ...ABS ANTI LOCK BRAKE SYSTEM 8 138 ...
Page 704: ...ELECTRICAL COMPONENTS 8 227 FJR1300A 5 1 3 2 17 8 10 11 12 13 14 15 16 7 6 4 9 ...
Page 706: ...ELECTRICAL COMPONENTS 8 229 FJR1300AS 13 16 18 17 2 3 4 5 6 7 8 1 9 10 11 12 15 14 19 ...
Page 708: ...ELECTRICAL COMPONENTS 8 231 FJR1300AS 1 19 3 2 5 7 9 8 12 13 14 15 16 11 10 18 17 6 4 ...
Page 736: ...ELECTRICAL COMPONENTS 8 259 ...
Page 745: ......
Page 746: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...