9-7
Tiller handle (tiller handle model)
q.
Connect the connectors “a” of the PTT
switch Red (R) lead, Sky blue (Sb) lead,
and Light green (Lg) lead (PTT model).
r.
Connect the connectors “a” of the neutral
switch Brown (Br) leads, and then install
the holders “1” and “2” and the bracket “3”.
s.
Install the shift cable “1”, throttle cable “2”,
clips “3”, and cable clamps “4”.
t.
Connect the alert indicator couplers “a”
and “b”, and then install the cover “1”.
u.
Install the grease nipple “2”, and then tight-
en it to the specified torque.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
Lg
R
S
b
a
Br
a
1
1
2
2
3
A
1
1
4
2
4
4
2
3
3
3
Grease nipple “2”
3.0 N·m (0.30 kgf·m, 2.2 lb·ft)
b
a
1
2
T
R
.
.
Summary of Contents for F30A 2018
Page 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Page 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Page 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Page 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Page 342: ...Jul 2018 ABE E ...