7-10
Power unit assembly
d.
Install the apron “1” and apron bolts “2”,
and then tighten the apron screws “3” to
the specified torque.
e.
Install the bracket “1”.
f.
Install the shift rod lever “2” to the shift rod
bracket “3”, and then install the clip “4”.
g.
Install the dipstick “1”.
h.
Connect the cooling water hoses “1”.
i.
Connect the fuel hose “1”.
j.
Connect the cooling water hose “1”, and
then fasten it using a new plastic tie “2”.
Apron screw “3”
3.0 N·m (0.30 kgf·m, 2.2 lb·ft)
1
2
3
T
R
.
.
4
2
3
1
1
1
1
1
2
Summary of Contents for F30A 2018
Page 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Page 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Page 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Page 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Page 342: ...Jul 2018 ABE E ...