7-28
Cylinder head
Checking the cylinder head bolt
1.
Measure:
• Cylinder head bolt (M9) diameter
Out of specification
Replace.
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a.
Measure the diameters “a” and “b” of the
cylinder head bolt (M9) at the specified
measuring points “c” and “d”.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
Installing the cylinder head
Before installing the cylinder head, check the
cylinder head bolts. See “Checking the cylinder
head bolt” (7-28).
1.
Check that the hole “a” on the retaining
plate is aligned with the “
△
” mark “b” on
the cylinder block.
2.
Install:
• Dowel pin
• Cylinder head gasket
• Cylinder head
3.
Tighten:
• Cylinder head bolt (M9)
• Cylinder head bolt (M6)
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a.
Tighten the cylinder head bolts (M9) “1” to
the specified torques in 3 stages and in the
order [1], [2], and so on.
TIP:
In the third tightening stage for the cylinder
head bolts (M9) “1”, mark the bolts and cylinder
head with identification marks “a”, and then
tighten the bolts 90
from the marks on the cyl-
inder head.
b.
Tighten the cylinder head bolts (M6) “2” to
the specified torques in 2 stages and in the
order [9], [10], and so on.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
Cylinder head bolt (M9) diameter
difference limit
“a” – “b” = Less than 0.13 mm
(0.01 in)
Measuring point “c”: 10.0 mm
(0.39 in)
Measuring point “d”: 62.5 mm
(2.46 in)
d
b
a
c
b
a
Cylinder head bolt (M9) “1” [1]–[8]
1st: 17 N·m (1.7 kgf·m, 13 lb·ft)
2nd: 34 N·m (3.4 kgf·m, 25 lb·ft)
3rd: 90
Cylinder head bolt (M6) “2” [9]–
[12]
1st: 6 N·m (0.6 kgf·m, 4.4 lb·ft)
2nd: 12 N·m (1.2 kgf·m, 8.9 lb·ft)
New
90°
[7]
[3]
[12]
[10]
[9]
[11]
[8]
[4]
[1]
[5]
[2]
[6]
1
2
a
T
R
.
.
Summary of Contents for F30A 2018
Page 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Page 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Page 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Page 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Page 342: ...Jul 2018 ABE E ...