POWR
Power unit
5-43
60C5D11
2.
Measure the crankshaft runout. Replace
the crankshaft if out of specification.
Checking the crankshaft pin oil
clearance
1.
Clean the bearings and the connecting
rod.
2.
Install the upper half of the bearing into
the connecting rod
1
and the lower half
into the connecting rod cap
2
.
CAUTION:
Install the bearings in their original posi-
tions.
3.
Put a piece of Plastigauge
®
(PG-1) onto
the crank pin, parallel to the crankshaft.
NOTE:
Be sure not to put the Plastigauge (PG-1)
over the oil hole in the crank pin of the crank-
shaft.
4.
Install the connecting rod to the crank pin
3
.
NOTE:
Make sure that the large, flat side
a
on the
connecting rod faces towards the flywheel
side of the crankshaft.
Crank stand alignment:
90890-03107
Crankshaft runout limit:
0.03 mm (0.0012 in)
S60C5900
S60C5960
S60C5A10
Summary of Contents for F100B
Page 1: ...SERVICE MANUAL 60C 28197 5D 11 290429 F100B F100C ...
Page 52: ...SPEC Specifications 2 17 60C5D11 MEMO ...
Page 162: ...LOWR Lower unit 6 15 60C5D11 Drive shaft and lower case F100B 6 ...
Page 190: ...LOWR Lower unit 6 43 60C5D11 Drive shaft and lower case F100C 6 ...
Page 200: ...LOWR Lower unit 6 53 60C5D11 Shimming F100C 6 ...
Page 209: ...60C5D11 7 2 1 2 3 4 5 6 7 8 9 MEMO Special service tools ...
Page 210: ...BRKT Bracket unit 7 3 60C5D11 Tiller handle 7 ...
Page 212: ...BRKT Bracket unit 7 5 60C5D11 ...
Page 214: ...BRKT Bracket unit 7 7 60C5D11 ...
Page 244: ...BRKT Bracket unit 7 37 60C5D11 Gear pump F100B 7 ...
Page 341: ......
Page 343: ......
Page 344: ...YAMAHA MOTOR CO LTD Printed in the Netherlands Jun 2001 0 5 1 CR F100BET F100CET E ...