
60C5D11
7-20
1
2
3
4
5
6
7
8
9
Installing the upper case
1.
Install the upper mount
1
and bolts
2
into the upper case.
2.
Install the bolts
3
, and then tighten them
to the specified torque.
3.
Install the lower mounts
4
to the upper
case.
4.
Install the mount cover
5
.
5.
Install the upper and lower mounting
bolts into the swivel bracket
6
simulta-
neously.
6.
Install the upper mounting nut
7
and
lower mounting nut
8
, and then tighten
them to the specified torques.
NOTE:
Before tightening the lower mounting nut, be
sure to connect the ground lead to the lower
mounting bolt.
7.
Install the oil pump assembly
9
.
T
R
.
.
Muffler assembly bolt
B
:
20 N·m (2.0 kgf·m, 14 ft·lb)
T
R
.
.
Upper mount bolt
3
:
26 N·m (2.6 kgf·m, 19 ft·lb)
S60C7100
LT
572
LT
572
A
S60C7105
LT
572
LT
572
A
T
R
.
.
Upper mounting nut
7
:
53 N·m (5.3 kgf·m, 38 ft·lb)
Lower mounting nut
8
:
73 N·m (7.3 kgf·m, 53 ft·lb)
Oil pump bolt
0
:
11 N·m (1.1 kgf·m, 8.0 ft·lb)
S60C7110
A
A
Upper case (F100B)
Summary of Contents for F100B
Page 1: ...SERVICE MANUAL 60C 28197 5D 11 290429 F100B F100C ...
Page 52: ...SPEC Specifications 2 17 60C5D11 MEMO ...
Page 162: ...LOWR Lower unit 6 15 60C5D11 Drive shaft and lower case F100B 6 ...
Page 190: ...LOWR Lower unit 6 43 60C5D11 Drive shaft and lower case F100C 6 ...
Page 200: ...LOWR Lower unit 6 53 60C5D11 Shimming F100C 6 ...
Page 209: ...60C5D11 7 2 1 2 3 4 5 6 7 8 9 MEMO Special service tools ...
Page 210: ...BRKT Bracket unit 7 3 60C5D11 Tiller handle 7 ...
Page 212: ...BRKT Bracket unit 7 5 60C5D11 ...
Page 214: ...BRKT Bracket unit 7 7 60C5D11 ...
Page 244: ...BRKT Bracket unit 7 37 60C5D11 Gear pump F100B 7 ...
Page 341: ......
Page 343: ......
Page 344: ...YAMAHA MOTOR CO LTD Printed in the Netherlands Jun 2001 0 5 1 CR F100BET F100CET E ...