60C5D11
5-44
1
2
3
4
5
6
7
8
9
5.
Tighten the connecting rod bolts to the
specified torques in two stages.
NOTE:
• Reuse the connecting rod bolts.
• Do not turn the connecting rod until the
crank pin oil clearance measurement has
been completed.
• Make a mark on the connecting rod bolts
and connecting rod caps, and then tighten
the bolts 90° from the mark.
• Use a E-type TORX socket (E10) to install
the connecting rod bolts.
6.
Remove the connecting rod cap and
measure the width of the compressed
Plastigauge (PG-1) on each crank pin.
Replace the connecting rod bearing if out
of specification.
Selecting the connecting rod big end
bearing
1.
When replacing the connecting rod bear-
ing, select the suitable bearing as fol-
lows.
2.
Measure the connecting rod big end
inside diameter
a
.
NOTE:
Reuse the connecting rod bolts.
T
R
.
.
Connecting rod bolt:
1st: 18 N·m (1.8 kgf·m, 13 ft·lb)
2nd: 90°
Crank pin oil clearance:
0.023–0.035 mm
(0.0010–0.0013 in)
Connecting rod big end inside
diameter
a
:
47.03–47.04 mm
(1.8514–1.8518 in)
S60C5980
Cylinder body
Summary of Contents for F100B
Page 1: ...SERVICE MANUAL 60C 28197 5D 11 290429 F100B F100C ...
Page 52: ...SPEC Specifications 2 17 60C5D11 MEMO ...
Page 162: ...LOWR Lower unit 6 15 60C5D11 Drive shaft and lower case F100B 6 ...
Page 190: ...LOWR Lower unit 6 43 60C5D11 Drive shaft and lower case F100C 6 ...
Page 200: ...LOWR Lower unit 6 53 60C5D11 Shimming F100C 6 ...
Page 209: ...60C5D11 7 2 1 2 3 4 5 6 7 8 9 MEMO Special service tools ...
Page 210: ...BRKT Bracket unit 7 3 60C5D11 Tiller handle 7 ...
Page 212: ...BRKT Bracket unit 7 5 60C5D11 ...
Page 214: ...BRKT Bracket unit 7 7 60C5D11 ...
Page 244: ...BRKT Bracket unit 7 37 60C5D11 Gear pump F100B 7 ...
Page 341: ......
Page 343: ......
Page 344: ...YAMAHA MOTOR CO LTD Printed in the Netherlands Jun 2001 0 5 1 CR F100BET F100CET E ...