CHK
ADJ
Periodic checks and adjustments
3-9
60C5D11
È
F100B
É
F100C
2.
Place the lower unit in water, and then
start the engine.
3.
Check for water flow at the cooling water
outlet. If there is no water flow, check the
cooling water passage inside the out-
board motor.
Control system
3
Checking the throttle cable operation
1.
Check that the throttle control lever
1
touches the fully closed stopper
a
when
the remote control lever is in neutral or
the throttle grip is fully closed. Adjust the
throttle cable length, if necessary, as fol-
lows.
2.
Loosen the locknut
2
, remove the clip
3
, and then disconnect the throttle cable
joint
4
.
3.
Contact the throttle control lever
1
with
the fully closed stopper
a
.
4.
Adjust the position of the throttle cable
joint until its hole is aligned with the set
pin
b
on the throttle control lever.
S60C3370
S60C3350
S60C3360
S60C3390
S60C3400
Summary of Contents for F100B
Page 1: ...SERVICE MANUAL 60C 28197 5D 11 290429 F100B F100C ...
Page 52: ...SPEC Specifications 2 17 60C5D11 MEMO ...
Page 162: ...LOWR Lower unit 6 15 60C5D11 Drive shaft and lower case F100B 6 ...
Page 190: ...LOWR Lower unit 6 43 60C5D11 Drive shaft and lower case F100C 6 ...
Page 200: ...LOWR Lower unit 6 53 60C5D11 Shimming F100C 6 ...
Page 209: ...60C5D11 7 2 1 2 3 4 5 6 7 8 9 MEMO Special service tools ...
Page 210: ...BRKT Bracket unit 7 3 60C5D11 Tiller handle 7 ...
Page 212: ...BRKT Bracket unit 7 5 60C5D11 ...
Page 214: ...BRKT Bracket unit 7 7 60C5D11 ...
Page 244: ...BRKT Bracket unit 7 37 60C5D11 Gear pump F100B 7 ...
Page 341: ......
Page 343: ......
Page 344: ...YAMAHA MOTOR CO LTD Printed in the Netherlands Jun 2001 0 5 1 CR F100BET F100CET E ...