Maintenance
85
EMU46250
*1 cylinder head
*2 exhaust cover, exhaust guide
EMU46080
Maintenance chart 2
Thermostat
Inspection or
replacement as
necessary
—
Timing belt
Inspection or
replacement as
necessary
—
Valve clearance
Inspection and
adjustment
—
Cooling water inlet
Inspection
26
Main switch/stop
switch
Inspection or
replacement as
necessary
—
Wire harness con-
nections/wire cou-
pler connections
Inspection or
replacement as
necessary
—
(Yamaha)
Meter/gauge
Inspection
—
Fuel tank (Yamaha
portable tank)
Inspection and
cleaning as neces-
sary
—
Item
Actions
Every
Page
1000 hours
Exhaust
guide/exhaust
manifold
Inspection or
replacement as
necessary
—
Timing belt
Replacement
—
Item
Actions
Initial
Every
Page
20 hours
(3 months)
100 hours
(1 year)
300 hours
(3 years)
500 hours
(5 years)
6BP-9-3B-1E0.book 85 ページ 2015年11月16日 月曜日 午後5時57分