3-6
GB
000989
000984
000991
3)
Second hour:
Accelerate at full throttle onto plane,
then reduce engine speed to three-quar-
ter throttle (approximately 4,000 r/min).
Vary engine speed occasionally. Run at
full throttle for one minute, then allow
about 10 minutes of operation at three-
quarter throttle or less to let the engine
cool.
4)
Third through tenth hours:
Avoid operating at full throttle for more
than 5 minutes at a time. Let the engine
cool between full-throttle runs. Vary
engine speed occasionally.
5)
After the first 10 hours:
Operate the engine normally. Use the
standard premix ratio of gasoline:oil.
Refer to “GASOLINE/PETROL AND OIL
MIXING” for details.
69R-9-71 (GB,F,ES) 3A 3/23/02 2:32 PM Page 14
Summary of Contents for 25B
Page 2: ...67K 9 14 1 2 28 02 11 23 AM Page 2 ...
Page 145: ... MEMO 69R 9 71 GB F ES 4A 3 23 02 2 34 PM Page 27 ...
Page 147: ... MEMO 69R 9 71 GB F ES 4A 3 23 02 2 34 PM Page 29 ...
Page 204: ...EMU00450 Chapter 6 INDEX INDEX 6 1 GB 69R 9 71 GB F ES 6 3 23 02 2 37 PM Page 2 ...
Page 212: ...67K 9 14 1 2 28 02 11 23 AM Page 2 ...