
FRONT ARMS AND FRONT SHOCK ABSORBER ASSEMBLIES
4-49
EAS29760
CHECKING THE FRONT SHOCK
ABSORBER ASSEMBLIES
The following procedure applies to both of the
front shock absorber assemblies.
1. Check:
• Front shock absorber assembly
Oil leaks
→
Replace the front shock
absorber assembly.
• Front shock absorber rod
Bends/damage
→
Replace the front
shock absorber assembly.
• Spring
Move the spring up and down.
Fatigue
→
Replace the front shock
absorber assembly.
• Gas cylinder (for 4D3H, 4D3M)
Damage/gas leaks
→
Replace the front
shock absorber assembly.
EAS29770
CHECKING THE FRONT ARM BALL JOINTS
The following procedure applies to each of the
front arm ball joints.
1. Check:
• Ball joint
Damage/pitting
→
Replace the front arm.
Free play
→
Replace the front arm.
Turns roughly
→
Replace the front arm.
EAS29790
INSTALLING THE FRONT ARMS AND
FRONT SHOCK ABSORBER ASSEMBLIES
The following procedure applies to both of the
front upper arms, front lower arms, and front
shock absorber assemblies.
1. Install:
• Front upper arm “1”
• Front lower arm “2”
• Front shock absorber assembly
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Install the front upper arm “1” and front
lower arm “2”.
TIP
• Be sure to position the front upper and lower
arm bolts so that the bolt heads face forward.
• Temporarily tighten the front upper and lower
arm nuts.
b. Install the front shock absorber assembly.
c. Install the steering knuckle.
d. Install the new cotter pins.
e. Tighten the front upper and lower arm nuts
to specification.
A. for 4D3D
B. for 4D3H, 4D3M
Front shock absorber assembly
nut
48 Nm (4.8 m·kg, 35 ft·lb)
Upper steering knuckle nut
25 Nm (2.5 m·kg, 18 ft·lb)
Lower steering knuckle nut
25 Nm (2.5 m·kg, 18 ft·lb)
Summary of Contents for 2009 YFM25RY
Page 1: ...SERVICE MANUAL YFM25RY YFM25RSEY YFM25RSE2Y 4D3 28197 11 LIT 11616 22 09 2009 ...
Page 8: ......
Page 39: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 20 ...
Page 42: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 23 EAS20410 LUBRICATION DIAGRAMS ...
Page 44: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25 ...
Page 46: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 ...
Page 47: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 28 1 Oil cooler 2 Oil hose 1 3 Oil hose 2 ...
Page 48: ...CABLE ROUTING 2 29 EAS20430 CABLE ROUTING ...
Page 50: ...CABLE ROUTING 2 31 ...
Page 52: ...CABLE ROUTING 2 33 ...
Page 54: ...CABLE ROUTING 2 35 ...
Page 56: ...CABLE ROUTING 2 37 ...
Page 58: ...CABLE ROUTING 2 39 ...
Page 60: ...CABLE ROUTING 2 41 ...
Page 62: ...CABLE ROUTING 2 43 ...
Page 65: ......
Page 143: ...HANDLEBAR 4 42 Throttle cable free play 2 0 4 0 mm 0 08 0 16 in ...
Page 162: ...CHAIN DRIVE 4 61 ...
Page 165: ......
Page 240: ...CARBURETOR 6 9 ...
Page 242: ...IGNITION SYSTEM 7 1 EAS27090 IGNITION SYSTEM EAS27100 CIRCUIT DIAGRAM ...
Page 246: ...ELECTRIC STARTING SYSTEM 7 5 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM ...
Page 252: ...CHARGING SYSTEM 7 11 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Page 255: ...CHARGING SYSTEM 7 14 ...
Page 256: ...LIGHTING SYSTEM 7 15 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM ...
Page 260: ...SIGNALING SYSTEM 7 19 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Page 264: ...CARBURETOR HEATING SYSTEM 7 23 EAS27490 CARBURETOR HEATING SYSTEM EAS27500 CIRCUIT DIAGRAM ...
Page 267: ...CARBURETOR HEATING SYSTEM 7 26 ...
Page 268: ...ELECTRICAL COMPONENTS 7 27 EAS27972 ELECTRICAL COMPONENTS ...
Page 270: ...ELECTRICAL COMPONENTS 7 29 EAS27980 CHECKING THE SWITCHES ...
Page 284: ...ELECTRICAL COMPONENTS 7 43 ...
Page 291: ......
Page 292: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...
Page 293: ...WIRING DIAGRAM YFM25RY YFM25RSEY YFM25RSE2Y ...