ENG
4-24
2. Replace:
• Valve guide
NOTE:
NOTE:
To ease valve guide removal and installation,
and to maintain the correct fit, heat the cylinder
head to 100°C (212°F) in an oven.
a. Remove the valve guide with the valve
guide remover
.
b. Install the new valve guide with the valve
guide installer
and valve guide remover
.
c. After installing the valve guide, bore the
valve guide with the valve guide reamer
to obtain the proper valve-stem-to-valve-
guide clearance.
NOTE:
NOTE:
After replacing the valve guide, reface the
valve seat.
3. Eliminate:
• Carbon deposits
(from the valve face and valve seat)
4. Check:
• Valve face
Pitting/wear
→
Grind the valve face.
• Valve stem end
Mushroom shape or diameter larger than
the body of the valve stem
→
Replace the
valve.
Valve guide remover (ø6)
90890-04064
Valve guide remover (6.0 mm)
YM-04064-A
Valve guide installer (ø6)
90890-04065
Valve guide installer (6.0 mm)
YM-04065-A
Valve guide reamer (ø6)
90890-04066
Valve guide reamer (6.0 mm)
YM-04066
VALVES AND VALVE SPRINGS
Summary of Contents for 2008 Raptor 250
Page 1: ...SERVICE MANUAL YFM250RX 4D3 28197 10 LIT 11616 21 22 2008 ...
Page 6: ......
Page 47: ...SPEC 2 24 Oil cooler Oil hose 1 Oil hose 2 OIL FLOW DIAGRAMS ...
Page 308: ......
Page 309: ......
Page 310: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A ...