Manual Ozone Generating System SMOevo
Error! Use the Home tab to apply Überschrift 1 to
the text that you want to appear here.
Rev. 1.0
Page 62 of 91
7 Installation and Initial Start Up
This section describes the safety measures, the requirements for the personnel, and the
procedure with regard to installation and initial start up of the ozone generating system.
7.1 Installation
7.1.1 Safety Instructions
DANGER!
Live components!
Danger to life due to electric shock.
Prior to installation work, ensure that the ozone system is
disconnected from the power supply.
(The main switch is set to
0/OFF
).
WARNING!
Risk of accident due to not sufficiently qualified personnel!
Danger to life or serious injury may result
Work on live components may only be carried out by
electrically qualified persons or by specially instructed
personnel under the supervision of an electrically qualified
person.