Table of Contents
1.2.1 Safety terminology and symbols.................................................................................3
1.2.2 Safety instruction decals.............................................................................................. 4
2.2 Safe handling requirements............................................................................................... 7
2.3 Storage requirements....................................................................................................... 10
3.1 General description...........................................................................................................11
3.2 Operational specifications................................................................................................11
3.3 Nameplate information.....................................................................................................12
4.1.1 Pump location guidelines..........................................................................................13
4.1.2 Typical installation...................................................................................................... 14
4.1.3 Foundation requirements..........................................................................................14
4.1.4 Level the base on a concrete foundation ............................................................... 15
4.1.5 Grout the baseplate....................................................................................................16
4.2.1 Prepare for alignment................................................................................................ 16
4.2.2 Align the pump using a straight edge and calipers...............................................17
4.2.3 Align the pump using a dial indicator......................................................................18
4.2.4 Final alignment............................................................................................................19
4.2.5 Optional alignment procedure.................................................................................19
4.2.6 Dowel the pump and driving unit.............................................................................19
4.2.7 Coupler limitations..................................................................................................... 20
4.3.1 Piping checklist........................................................................................................... 20
4.3.2 Suction piping checklist............................................................................................. 21
5.1.1 Pre-start checks........................................................................................................... 24
5.1.2 Priming......................................................................................................................... 25
5.1.3 Starting.........................................................................................................................25
5.1.4 Operating checks....................................................................................................... 25
5.1.5 Check the rotation...................................................................................................... 25
5.1.6 Freezing protection.................................................................................................... 26
5.1.7 Change the rotation................................................................................................... 26
Table of Contents
G&L Pumps Series A-C 8100 Base Mounted Centrifugal Pump INSTRUCTION MANUAL
1