5015T Flat Panel Industrial Monitor Chapter 2 Installation
9
142029 (D)
Panel Installation
This monitor should be mounted in and used where NEMA 4 and NEMA 12 type
enclosures are employed. When mounted properly, the monitor meets or exceeds the
sealing requirements set forth in the NEMA 4 and NEMA 12 specifications. The monitor
uses "U"-shaped clips and a special gasket to achieve the proper seal.
To install the monitor, make a cutout per the diagram below in one of the walls of your
NEMA enclosure. Enclosures made of heavier gauge metal work better in that they won't
deform or bend as easily when the monitor's sealing gasket is compressed. Next hold the
monitor in place while you install the mounting clips. Tighten the clips in a cross pattern.
This will help to develop an even pressure on the sealing gasket. Tighten the clips to the
point were the back of the monitor's front bezel just begins to contact the front of the
NEMA enclosure.
Caution:
Do not over-tighten because it can cause damage to the monitor, which can
result in loss of seal integrity.
Panel Mounting Dimensions
12.87 +.04/-0[327 +1/-0]
in. [mm]