68
Hood Installation
Prepare Ovens - Right Hand Control Box Closeout Bracket
Control Box Closeout Bracket
Conveyor Opening Screws
Conveyor and chain guard removed for clarity
Install one (1) control box closeout bracket on top oven using the two (2) screws already installed
in conveyor opening bezel. Orientate bracket with flange toward center of conveyor.
Prepare Ovens - Right Side Bottom Rail Bracket
Install one (1) bottom rail bracket on bottom oven using two (2) center screws already installed in
control box. Orientate bracket with square hole down and flange toward oven.
Bottom Rail Bracket
Control Box Screws
Summary of Contents for 1832-AE-B
Page 43: ...43 This page intentionally left blank ...
Page 88: ...This page intentionally left blank ...
Page 95: ...95 Oven Schematic 1832 2440 3240 3255 3855 Square Burner Standard ...
Page 96: ...96 Oven Schematic 1832 2440 3240 3255 3855 Square Burner World ...
Page 97: ...97 Oven Schematic 1832 2440 3240 3255 3855 Round Burner Australia ...
Page 98: ...98 Oven Schematic 3270 3870 Square Burner Standard RH Control Box ...
Page 99: ...99 3270 3870 Square Burner Standard LH Control Box Oven Schematic ...
Page 100: ...100 Oven Schematic 3270 3870 Square Burner World RH Control Box ...
Page 101: ...101 Oven Schematic 3270 3870 Square Burner World LH Control Box ...
Page 102: ...102 3270 3870 Round Burner Australia LH Control Box Oven Schematic ...
Page 103: ...103 Oven Schematic 3270 3870 Round Burner Australia RH Control Box ...
Page 104: ...104 Hood Schematic Standard ...
Page 105: ...105 Hood Schematic World ...