This section provides detailed information on installing the RS2000. The overall
procedure is divided into eight steps:
1. Choosing a location
2. Mounting the inverter/charger
3. Connecting the AC input wires and AC output wires
4. Connecting the DC cables
5. Connecting the battery temperature sensor
6. Connecting to the network
7. Performing checks prior to initial start-up
8. Testing your installation