
38
1.
Reassemble the new Pump Controller board back into the original position and secure the
component with screws, then reconnect the connectors connecting the Peristaltic Pump
and the Searchlight.
2.
Reassemble the Peristaltic Pump Housing Top Cover and Peristaltic Pump Housing back
into the original position and secure each component with screws.
3.
Reconnect the outlet tube for the Peristaltic Pump Housing.
🛠
Assemble:
I.
After the reassembly of the Pump Controller Board is completed, perform a spray test of all
the pumps to confirm the corresponding pump is working normally.
II.
During reassembly, be aware of the sequence of the connectors (M1, M2, M3, M4) when
reconnecting.
III.
During reassembly, be aware and ensure the sealing of the Peristaltic Pump Housing and
its top cover is installed correctly.
•
After the reassembly of the Pump Controller Board is completed, perform a spray test of all
the pumps to confirm the corresponding pump is working normally.
IMPORTANT:
🔎
CHECK :
@2020 XAG Australia All Rights Reserved