XDS PRO4-P Receiver User‟s Guide
X-Digital Systems
Rev K - July 29, 2008
11
2.4
Physical Installation of the Receiver
The following section will guide you through the physical installation of the PRO4-P
receiver.
2.4.1 Rack Mounting the Receiver
The PRO4-P receiver has been specifically designed to fit into a 19-inch rack. There are
four screw holes provided on the front panel to directly mount the receiver in the rack.
All four screws must be in place after installing the receiver.
Caution!
Do not paint mounting ears as it hinders the grounding path from
the receiver to the rack.
2.4.2 Uneven Loading of Rack
When installing the PRO4-P receiver into a rack, make sure to place heavier pieces of
equipment on the bottom and lighter pieces on the top.
Caution!
Uneven loading may cause the rack to be unstable and
hazardous.
2.5
Connecting to the Satellite Dish
This section contains information required for connecting your PRO4-P receiver to a
satellite downlink.
2.5.1 DC Voltage Requirement
You may need to have the PRO4-P receiver supply DC voltage to either an LNB or a
block down-converter (used after an LNA). If this is the case, the user must change the
receiver‟s LNB ON/OFF settings using the front panel display. For directions on how to
use the front panel display, see Chapter 4 of this manual. If, however, you have another