![Wood-mizer SHR-T Series User Manual Download Page 35](http://html.mh-extra.com/html/wood-mizer/shr-t-series/shr-t-series_user-manual_994673035.webp)
Obs³uga maszyny
Operation Procedure
Obs³uga maszyny
MHdoc051512
2-16
2
11.
Place the test material on the feed track and start the feed track.
DANGER!
Always be aware of and take proper protective
measures against rotating shafts, pulleys, fans, etc. Always
stay a safe distance from rotating members and make sure
that loose clothing or long hair does not engage rotating
members resulting in possible injury.
12.
Shut off the blade and feed track. Measure the finished material and adjust the saw head
up or down as necessary. Repeat with the test material until the desired finished
dimension is obtained.
13.
Restart the blade and feed track.
14.
Place material on the infeed table. Return unfinished material to be re-fed into the resaw,
i.e. place it on the return table.
15.
Monitor blade tension as operation continues. Adjust blade tension if required.
16.
If material jam occurs, stop the blade motor and feed track.
WARNING!
Allow blade to come to a complete stop before
servicing. Failure to do so will result in serious injury.
17.
After operation is complete, shut off the blade motor and feed track.
18.
Release blade tension if done sawing for the day.
CAUTION!
Remove tension from the blade when the resaw
is not in use.
Summary of Contents for SHR-T Series
Page 1: ...Table of Contents Section Page Table of Contents SW 07doc0515121...
Page 2: ......
Page 106: ...DC Electromagnetic Brake Service 7 7 3 EAdoc051512 DC Electromagnetic Brake...
Page 107: ...DC Electromagnetic Brake Service DC Electromagnetic Brake EAdoc051512 7 4 7...
Page 108: ...DC Electromagnetic Brake Service 7 7 5 EAdoc051512 DC Electromagnetic Brake...
Page 109: ...DC Electromagnetic Brake Service DC Electromagnetic Brake EAdoc051512 7 6 7...