OPERATION
Edger Setup
3
3-10
EGdoc022715
Operation
IMPORTANT!
When starting the machine for the first time, check that
blade rotation direction is as indicated by the arrow located on the
blades covers. If the rotation direction is incorrect, invert the phases in
the phase inverter located in the power socket (electric box). Setting
the phases in the phase inverter correctly will ensure correct rotation
directions of all machine motors.
IMPORTANT!
When starting the machine for the first time, let it run
without any load for 1-2 hours. It will let the infeed and outfeed tables
drive components to grind in.
The Edger can be lifted using the forklift only. Forklift must be rated for at least 2000kg
(4409 lb). Edger is equipped with forklift pockets. Remove sawdust hopper before lifting the
Edger by forklift. Insert the forks into the pockets shown on the picture below.
FIG. 3-9
tb0043b
Summary of Contents for EE20S-EMR
Page 1: ......
Page 2: ......
Page 37: ...OPERATION Machine Start Operation EGdoc022715 3 15 3 FIG 3 13 EG250 CONTROL PANEL 0 1 tb0089 ...
Page 153: ...DC Electromagnetic Brake ce only Service DC Electromagnetic Brake ce only EAdoc022715 11 3 11 ...
Page 154: ...DC Electromagnetic Brake ce only Service 11 11 4 EAdoc022715 DC Electromagnetic Brake ce only ...
Page 155: ...Laser Information Specifications MHdoc022715 13 1 13 SECTION 12 LASER INFORMATION ...
Page 156: ...Laser Information 13 13 2 MHdoc022715 Specifications ...
Page 157: ...Laser Information Specifications MHdoc022715 13 3 13 ...
Page 158: ...Laser Information 13 13 4 MHdoc022715 Specifications ...