OPERATION
Pre-Operation Check
Operation
EGdoc022715
3-1
3
SECTION 3 OPERATION
3.1
Pre-Operation Check
Prior to operating the Edger; always perform these basic checks:
1.
Make sure the Edger is level. Secure the legs to the surface. Cement pads or foundations must be
built. Legs must be fastened to the foundation using 16mm anchored bolts.
CAUTION!
Always be sure the machine is level prior to operating.
Failure to do so can and will affect machine operation and wear life.
2.
Make sure the tables are level with the rest of the Edger. Legs must be fastened to the foundation
using 16mm anchored bolts.
3.
Make sure the motor drive belt is tensioned properly.
WARNING!
Do not for any reason adjust the motor drive belts with the
motor running. Doing so may result in serious injury.
4.
Be sure the anti-kickback fingers are in proper working condition.
WARNING!
Always ensure that there is a sharp point on the
anti-kickback fingers before each use of the Edger.
Be sure anti-kickback fingers are free from obstruction and are in a
downward position with lever released. Failure to do so may result in
serious injury.
Summary of Contents for EE20S-EMR
Page 1: ......
Page 2: ......
Page 37: ...OPERATION Machine Start Operation EGdoc022715 3 15 3 FIG 3 13 EG250 CONTROL PANEL 0 1 tb0089 ...
Page 153: ...DC Electromagnetic Brake ce only Service DC Electromagnetic Brake ce only EAdoc022715 11 3 11 ...
Page 154: ...DC Electromagnetic Brake ce only Service 11 11 4 EAdoc022715 DC Electromagnetic Brake ce only ...
Page 155: ...Laser Information Specifications MHdoc022715 13 1 13 SECTION 12 LASER INFORMATION ...
Page 156: ...Laser Information 13 13 2 MHdoc022715 Specifications ...
Page 157: ...Laser Information Specifications MHdoc022715 13 3 13 ...
Page 158: ...Laser Information 13 13 4 MHdoc022715 Specifications ...