Spraying
The following steps for commissioning have to be completed before
spraying (see Chapter 5.1 Put the equipment into operation on
page 32).
1.
Place the suction pipe into the spraying material.
2.
Open the compressed air shut-off valve.
3.
Regulate the air inlet pressure such that the pump runs slowly.
4.
Unlock the spray gun and operate it until clean spraying materi-
al free from bubbles is emitted.
The pump and the hoses are now completely filled with materi-
al.
5.
Release the trigger and secure the spray gun.
The pump should stop when the trigger is released.
6.
Close the compressed air shut-off valve.
7.
Release the pressure in the equipment (see Chapter 5.5 Re-
lieve pressure on page 38).
8.
Install a spray nozzle suitable for the material used and the tip
guard.
Pay attention to the operation manual for the spray gun. It
contains a table for selecting the spray nozzle and explanations
for correct installation.
9.
Open the compressed air shut-off valve and set the spraying
pressure at the air regulator of the pump (see Chapter 5.2.1