Translation of the original operation manual
Airless 270_BAoDB_en_1405 • 0550022 • jw
Operation
5 Operation
³
The equipment must have been set up correctly and completely
assembled.
³
Do not start commissioning the equipment unless you have the
specified protective equipment. For more details, refer to Chap-
ter 2.5.4 Personal protective equipment on page 19.
³
A sufficient quantity of the spraying material has to be available.
Please observe the safety data sheet from the material
manufacturer.
³
You will need:
2 collecting vessels for excess material. These containers are
not included in the scope of delivery.
WARNING
If material pumps run dry, the generated friction heat can cause
fire or an explosion.
³
Always make sure that the material drums do not run dry
during operation. Never leave the equipment running unat-
tended.
³
However, should this happen, stop the corresponding pump
immediately and feed material.
5.1
Put the equipment into operation
³
Ensure proper grounding of the equipment and the object to be
coated (see chapter 4.3.3 on page 31).
³
Check whether all safety features are installed and fully opera-
tional (see Chapter 2.4 Safety features on page 15).
³
Check the level of release agent on the pump and top up if nec-
essary (see Chapter 6.4.2 Fill in release agent and check the fill
level on page 44). On Airless equipments on wall brackets,
release agent has to be added during first commissioning.
³
Flush the equipment (see Chapter 5.3 Flushing on page 35)
to remove the factory test medium (for first operation) or any
residue of previous spraying material.
³
During commissioning (flushing), check whether all equipment
parts are tight and re-tighten the connections if required.