1126700
SmartPAC 2 User Manual
I-4
Index
faults
installing
testing for faults
wiring
power, turning on to SmartPAC 2
presets (counter)
preset reached messages
setting and clearing
press
adjusting speed limits
selecting press type in SmartView
setting press name
setting press type
setting SmartPAC 2 for use with a link-motion
press
setting speed limits
setting the start time limit
setting the stop time limit
viewing the start time
viewing the start time limit
viewing the stop time
viewing the stop time limit
viewing the stopping angle
preventive maintenance (PM) monitor
assigning a new password
clearing an alert
entering the password
initializing
installing
making Initialization settings
modifying the tracking frequency in Run
mode
operation
selecting PM item names
setting tracking frequency
setting tracking units
using in Run mode
viewing PM status
ProCamPAC
adding or upgrading
board layouts
installing new board
replacing board
testing cam channels
verifying installation
ProCamPAC output assembly
board layout
connecting relays to equipment
installing diodes
mounting
running wiring in conduit
selecting relays for cam channels
wiring
Program mode
entering and exiting
main menu
navigation
overview
Program/Run key switch (SmartPAC 2),
using
pulse
setting batch counter output mode to
setting duration of pulsed batch counter
output
–R–
ready signal
adjusting for green sensors
overview
programming for green sensors
red sensors
faults
overview
selecting as sensor type
relays, cam output
connecting to equipment
installing diodes
installing suppressors
selecting for each channel
remote messages, sending in SmartView
remote reset switch, wiring
RESET key (SmartPAC 2), using
resolver
checking/setting direction of rotation
faults
installing
mounting
principle of operation
running wiring in conduit
wiring
zeroing
response time, Shadow light curtains
restore (tool and initialization data),
performing
Run mode
entering and exiting
main menu
navigation
overview
–S–
safety distance
calculating using the ANSI formula
calculating using the OSHA formula
increasing for floating or blanking windows
SBR (SmartPAC Backup and Restore)
using to back up tool settings in SmartPAC
1
using to restore SmartPAC 1 tool settings to
SmartPAC 2
scrap count, reporting to LETS
scrap count, reporting to SFC
screens (SmartPAC 2)
e-mailing screen captures
layout
making screen captures
Summary of Contents for SmartPAC2
Page 21: ...1126700 SmartPAC 2 User Manual xviii Table of Contents ...
Page 143: ...1126700 SmartPAC 2 User Manual 4 46 Initialization Mode ...
Page 197: ...1126700 SmartPAC 2 User Manual 5 54 Program Mode ...
Page 233: ...1126700 SmartPAC 2 User Manual 6 36 Run Mode ...
Page 245: ...1126700 SmartPAC 2 User Manual 7 12 Fault Messages ...
Page 271: ...1126700 SmartPAC 2 User Manual B 12 Updating SmartPAC 2 Firmware ...
Page 309: ...1126700 SmartPAC 2 User Manual E 6 Replacing SmartPAC 2 PC Board ...
Page 379: ......
Page 380: ......
Page 381: ......
Page 382: ......
Page 383: ......