English
39
PLE Systems & Solutions, Engineering Center Systems Oschersleben
2530098 Ed.3 EBA-VBH- vorläufig De/En- 01.11.2018
Content
English
1 General ...................................................................................................... 40
2 Safety ....................................................................................................... 40
2.4 Indication of instructions in the operating instructions ..................................... 40
2.5 Personnel qualifications .............................................................................. 41
2.6 Danger in the event of non-observance of the safety instructions ..................... 41
2.7 Safety-conscious operation ......................................................................... 41
2.8 Safety instructions for the operator .............................................................. 41
2.9 Safety instructions for inspection and installation work .................................... 42
2.10 Unauthorised modification and manufacture of spare parts .............................. 42
2.11 Improper use ............................................................................................ 42
3 Transport and interim storage ........................................................................ 42
4 Intended use ............................................................................................... 43
5 Product information ...................................................................................... 43
5.4 Type key .................................................................................................. 43
5.5 Technical data ........................................................................................... 43
5.6 Scope of delivery ....................................................................................... 44
5.7 Accessories ............................................................................................... 45
6 Description and function ................................................................................ 45
6.4 Description ............................................................................................... 45
6.5 Function ................................................................................................... 46
7 Installation and electrical connection ............................................................... 47
7.4 Preparations for installation ......................................................................... 47
7.5 Hygiene (TrinkwV 2001) ............................................................................. 47
7.6 Connecting the pressure boosting system ..................................................... 48
7.7 Connection to the water supply network ....................................................... 48
7.4.3 Float valve (for type ACS already installed in scope of delivery) .................... 48
7.4.4 Diaphragm valve (for tanks with appropriate connection) ............................ 48
7.8 Elektrical connection .................................................................................. 49
8 Commissioning ............................................................................................ 49
9 Maintenance and cleaning .............................................................................. 49
10 Faults, causes and remedies .......................................................................... 50
11 Spare parts ................................................................................................. 50
12 Appendix (Illustrations) ................................................................................. 51
1.8 Illustrations .............................................................................................. 51
1.9 Legend for the illustrations .......................................................................... 52