Motor power [kW]
Measuring surface sound-pressure level Lp, A [dB(A)]
1)
2900 rpm
1450 rpm
75
77
74
90
77
72
110
79
72
132
79
72
160
79
74
200
79
75
250
85
-
1)
Spatial mean value of sound-pressure levels on a square measuring surface at a dis-
tance of 1 m from the surface of the motor
Table 3:
Anticipated noise levels (50 Hz)
7
Installation
7.1
Personnel qualifications
ƒ
Installation/dismantling work: The installation/dismantling must be carried out by a
qualified technician who is trained in the use of the necessary tools and fixation
materials.
7.2
Operator responsibilities
ƒ
Observe national and regional regulations!
ƒ
Observe locally applicable accident prevention and safety regulations of profes-
sional and trade associations.
ƒ
Provide protective equipment and ensure that the protective equipment is worn by
personnel.
ƒ
Observe all regulations for working with heavy loads.
7.3
Safety
DANGER
Risk of fatal injury due to lack of protective devices!
Due to missing protective devices of the terminal box or in the range of the coup-
ling/motor, electric shock or contact with rotating parts can lead to life-threatening
injuries.
• Before commissioning, safety devices such as coupling covers that were removed
must be reinstalled!
DANGER
Risk of fatal injury from falling parts!
The pump itself and pump parts can be extremely heavy. Falling parts pose a risk of
cuts, crush injuries, bruises or impacts, which can be fatal.
• Always use suitable lifting equipment and secure parts against falling.
• Never stand underneath a suspended load.
• During storage and transport, as well as before all installation and assembly work,
ensure that the pump is in a safe position and standing securely.
WARNING
Hot surface!
The entire pump can become very hot. There is a risk of burns!
• Allow the pump to cool down before commencing any work!
WARNING
Risk of scalding!
At high fluid temperatures and system pressures, allow the pump to cool down first
and then depressurise the system.
Summary of Contents for Atmos GIGA-B
Page 2: ......
Page 3: ...Unmounting the mechanical seal Fig I Fig II 2 1 1 1 Fig III Fig IV 50 Fig V Fig VI 4 4 1 2 3...
Page 4: ...Fig VII Fig VIII 2 1 3 Fig IX Fig X 3 2 1 Fig XI...
Page 5: ...Mounting the mechanical seal Fig XII Fig XIII 1 Fig XIV Fig XV 1 2 3 Fig XVI Fig XVII...
Page 6: ...Fig XVIII Fig XIX 1 2 1 Fig XX Fig XXI Fig XXII Fig XXIII 1 1 2...
Page 7: ...Exchange of Motor Fig XXIV Fig XXV 1 8x Fig XXVI Fig XXVII Fig XXVIII...
Page 10: ......
Page 11: ...11 Chinese simplified 12 English 37...
Page 13: ...zh CHS Wilo Atmos GIGA I B 13 1 1 1 1 2 WILO SE 2022 1 3 Wilo 2 2 1 2 2...
Page 14: ...zh CHS 14 WILO SE 2022 06 2 3 RCD 2 4 2 5 2 6...
Page 15: ...zh CHS Wilo Atmos GIGA I B 15 2 7 2 8 IEC VDE 8 3 3 1 3 2 3 3 Wilo...
Page 16: ...zh CHS 16 WILO SE 2022 06 3 4 30 kg 30 Atmos GIGA B...
Page 17: ...zh CHS Wilo Atmos GIGA I B 17 4 4 1 Atmos GIGA I Atmos GIGA D Atmos GIGA B 4 2...
Page 21: ...zh CHS Wilo Atmos GIGA I B 21 1 Qmin Qmin Qmin 10 x Qmax 7 4 Wilo 200 mm...
Page 24: ...zh CHS 24 WILO SE 2022 06 r 5 x DN d s r 2 5 d 2s Fig 4 3 4 8 5 8...
Page 27: ...zh CHS Wilo Atmos GIGA I B 27 Wilo 9 1 9 2 1 2...
Page 28: ...zh CHS 28 WILO SE 2022 06 2 Fig 7 NPSH NPSH 1 L1 L2 V1 V2 W1 W2 9 3 9 4 9 5...
Page 29: ...zh CHS Wilo Atmos GIGA I B 29 3 Fig 8 10 10 Wilo...
Page 30: ...zh CHS 30 WILO SE 2022 06 10 1 10 2 10 2 1 Wilo 1 2 3 4...
Page 34: ...zh CHS 34 WILO SE 2022 06 Wilo PTC 40 C Wilo 6 12 Wilo...
Page 36: ...zh CHS 36 WILO SE 2022 06 13 2 www wilo recycling com...
Page 67: ......