en
Commissioning
56
WILO SE 2022-06
WARNING
There is a risk of burns or freezing upon coming into contact with the
pump/system.
Depending on the pump and system operating conditions (fluid temperature), the
entire pump can become very hot or very cold.
• Keep a safe distance during operation!
• Allow the system and pump to cool to room temperature!
• Always wear protective clothing, protective gloves and protective goggles when
working.
DANGER
Danger of personal injury and property damage due to extremely hot or
extremely cold pressurised fluid!
Depending on the temperature of the fluid, when the venting device is opened com-
pletely,
extremely hot
or
extremely cold
fluid may escape in liquid or vapour form.
Fluid may shoot out at high pressure depending on the system pressure.
• Always exercise caution when opening the venting device.
Fill and vent the system correctly.
1.
To do this, loosen the air vent valves and vent the pump.
2.
After venting the pump, tighten the air vent valves again so that no more water
can escape.
NOTICE
• Always keep to the minimum pressure!
2
Fig. 7:
Check direction of rotation
ƒ
To avoid cavitation noises and damage, a minimum inlet pressure must be guaran-
teed at the suction port of the pump. The minimum inlet pressure depends on the
operating situation and the pump’s duty point. Accordingly, the minimum pressure
must be determined.
ƒ
The main parameters for defining the minimum inlet pressure are the NPSH value
of the pump at its duty point and the vapour pressure of the fluid. The NPSH value
can be found in the technical documentation of the respective pump type.
1.
By briefly switching on, check whether the direction of rotation agrees with the ar-
row on the fan cover. If the direction of rotation is incorrect, proceed as follows:
ƒ
For direct starting: Swap two phases on the motor terminal board (e.g. L1 for L2).
ƒ
For Y-Δ starting:
Swap the thread start and thread end of two windings on the motor terminal board
(e.g. V1 for V2 and W1 for W2).
9.3
Activation
ƒ
The unit may only be switched on when the shut-off device on the discharge side
is closed! Only after full speed has been reached may the shut-off device be slowly
opened and be adjusted to the duty point.
The unit must run smoothly and free of vibration.
The mechanical seal ensures that a seal will not leak and requires no special setting.
Should there be a small leakage at the beginning, it will stop when the initial inlet phase
of the gasket is over.
Summary of Contents for Atmos GIGA-B
Page 2: ......
Page 3: ...Unmounting the mechanical seal Fig I Fig II 2 1 1 1 Fig III Fig IV 50 Fig V Fig VI 4 4 1 2 3...
Page 4: ...Fig VII Fig VIII 2 1 3 Fig IX Fig X 3 2 1 Fig XI...
Page 5: ...Mounting the mechanical seal Fig XII Fig XIII 1 Fig XIV Fig XV 1 2 3 Fig XVI Fig XVII...
Page 6: ...Fig XVIII Fig XIX 1 2 1 Fig XX Fig XXI Fig XXII Fig XXIII 1 1 2...
Page 7: ...Exchange of Motor Fig XXIV Fig XXV 1 8x Fig XXVI Fig XXVII Fig XXVIII...
Page 10: ......
Page 11: ...11 Chinese simplified 12 English 37...
Page 13: ...zh CHS Wilo Atmos GIGA I B 13 1 1 1 1 2 WILO SE 2022 1 3 Wilo 2 2 1 2 2...
Page 14: ...zh CHS 14 WILO SE 2022 06 2 3 RCD 2 4 2 5 2 6...
Page 15: ...zh CHS Wilo Atmos GIGA I B 15 2 7 2 8 IEC VDE 8 3 3 1 3 2 3 3 Wilo...
Page 16: ...zh CHS 16 WILO SE 2022 06 3 4 30 kg 30 Atmos GIGA B...
Page 17: ...zh CHS Wilo Atmos GIGA I B 17 4 4 1 Atmos GIGA I Atmos GIGA D Atmos GIGA B 4 2...
Page 21: ...zh CHS Wilo Atmos GIGA I B 21 1 Qmin Qmin Qmin 10 x Qmax 7 4 Wilo 200 mm...
Page 24: ...zh CHS 24 WILO SE 2022 06 r 5 x DN d s r 2 5 d 2s Fig 4 3 4 8 5 8...
Page 27: ...zh CHS Wilo Atmos GIGA I B 27 Wilo 9 1 9 2 1 2...
Page 28: ...zh CHS 28 WILO SE 2022 06 2 Fig 7 NPSH NPSH 1 L1 L2 V1 V2 W1 W2 9 3 9 4 9 5...
Page 29: ...zh CHS Wilo Atmos GIGA I B 29 3 Fig 8 10 10 Wilo...
Page 30: ...zh CHS 30 WILO SE 2022 06 10 1 10 2 10 2 1 Wilo 1 2 3 4...
Page 34: ...zh CHS 34 WILO SE 2022 06 Wilo PTC 40 C Wilo 6 12 Wilo...
Page 36: ...zh CHS 36 WILO SE 2022 06 13 2 www wilo recycling com...
Page 67: ......