6 Commissioning, operation
WIKA Operating Instruction, Model Pascal ET, ET-P, ET/IS, ET-P/IS 49
GB
For the Cell Load, the channel 4C or D can calculate the result coming from a load cell connected
as per the below scheme:
Figure 46
– Cell Load connection