Horizontal Closures
To install horizontal closures across the top front surface of the sound-isolation room,
proceed with the following steps:
1. Install closure brackets along the top surface of the wall panel sections at the front of the room.
a. Space the brackets a maximum of 2-feet (610 mm) apart.
b. Position each bracket
13
/
16
" (21 mm) back from the front surface of the room.
c. Attach the brackets to the room using two #8-18 x ¾" self-drilling screws in each bracket.
2. If the closure panel is being mounted flush to the ceiling, attach a 2 x 4" metal stud
to secure the top of the closure panel.
If there is no ceiling directly above the closure panel, a 2 x 4" metal stud frame
must be built to secure the top of the closure panel.
Closure
Brackets
Closure
Brackets
#8-18 x ¾"
Self-Drilling
Screws
13
/
16
" (21 mm)
Recessed from Front
Surface
2-Feet (610 mm)
Maximum
Spacing
Front of
Closure Panel
Ceiling
Panel
Front of
Wall Panel
Existing
Ceiling
2 x 4"
Metal Stud
Front of
Closure Panel
Front of
Wall Panel
Ceiling
Panel
2 x 4"
Metal Stud
Frame
Closure
Bracket
PVC Closure
T-Extrusion
Closure
Bracket
PVC Closure
T-Extrusion