![Wenger SoundLok Assembly Instructions Manual Download Page 16](http://html1.mh-extra.com/html/wenger/soundlok/soundlok_assembly-instructions-manual_956773016.webp)
16
Installation (continued)
Ceiling Frame Rails
1. Position the first ceiling frame rail on top of the wall panel section that was installed first.
2. Loosely attach the ceiling frame rail to the top of the wall panel section using a
3
/
8
" neoprene washer,
a
5
/
16
" flat washer and a
5
/
16
-18 x
3
/
4
" capscrew through each of the pre-drilled holes
in the ceiling frame rail and into the matching rivet nut location on at the top of the wall panel.
3. Working in a clockwise direction position the next ceiling frame rail with the end tab on top of
the previously installed rail.
4. Continue to install the remaining ceiling frame rails according to the layout plan drawing.
5. Tighten all of the capscrews so that the neoprene washer is slightly compressed and the ceiling
frame rails are aligned with the others and secure against the wall panels to prevent sound loss.
6. The door can now be closed.
5
/
16
-18 x ¾" Hex
Head Capscrew
5
/
16
" Flat Washer
3
/
8
" Neoprene
Washer
Rivet
Nut
End
Tab
Installed
Ceiling
Frame Rail
Ceiling
Frame Rail