
26
Helmet & Shoulder Pad Holder Accessory Installation
Helmet & shoulder pad holders can be installed on top of the lockers.
1. Place the helmet & shoulder pad holder (19) to be centered over the four weldments in the pre-installed
rack on top of the locker
2. Secure the holder to the weldment holes using four 3/8-16 x 3/4" flange bolts (20).
The lips of the flange bolts hold it in place.
3. Plug in the fan connectors.
Helmet &
Shoulder Pad Holder
(19)
Lips of the flange bolts
hold the helmet & shoulder
pad holder in place
3/8-16 x 3/4"
Flange Bolt
(20)
A minimum 30" (762 mm) of clearance is recommended between the top of the locker and the
ceiling to allow fitting the equipment.
STOP