
14
Installation without Metal Base (continued)
4. a. Check the level of the entire floor where the
lockers will be installed.
b. Determine the highest point of the floor in
that area.
c. The locker installed at this highest location
will be the reference for all other lockers
to be leveled against.
5. Adjust the levelers on one side until the front
edges of the locker side panels are plumb
(side-to-side).
6. Measure A and B and adjust the front levelers
until A=B (+1/32 inch).