28
5.
Gently hammer out shaft and remove.
6.
Clean seal.
7.
Grease seal with food grade grease.
8.
Insert new shaft.
9.
Push new shaft past retraining ring groove and
install retaining ring.
10.
Tap shaft back to seat up against retaining ring.
11.
Complete reassembly by reinstalling bolt and
end cap.
Summary of Contents for CLEVELAND HA-MKGL-100
Page 30: ...29 WIRING DIAGRAM 208 240V Page 1 of 2 Continued on page 2...
Page 31: ...30 WIRING DIAGRAM 208 240V Page 2 of 2 Continued from page 1...
Page 32: ...31 WIRING DIAGRAM 460 480V Page 1 of 2 Continued on page 2...
Page 33: ...32 WIRING DIAGRAM 460 480V Page 2 of 2 Continued from page 1...
Page 59: ...TILTING MODELS STATIONARY MODELS 58 PLUMBING ASSEMBLY WATER METER...