9
Water Meter Option
1.
Switch to “
Hot
” or “
Cold
” water.
2.
Push “
” key until the digit you want to change is
flashing in the lower display window. Then use the
“
” key to change the value of the flashing digit.
3.
When all digits are selected (lower display window) for
the required quantity of water press the “
ENT
” key.
4.
Push “
RST
” button to start at “
0
”.
5.
To start filling kettle, turn “
START
” switch to
“
Continue
”.
6.
Delivery will start at “
0
” (upper display window) and
stop at the preset volume.
7.
To interrupt delivery anytime, turn “
INTERRUPT
”
switch to right.
8.
To complete delivery after interruption, again turn
“
START
” switch to “
Continue
”.
9.
Turning “
START
” switch to “
RESET
” will again start
the delivery from “
0
”.
Mixing
("AGITATOR ")
WARNING:
•
Never add product to kettle while agitator is running.
•
Do not put hands in kettle.
•
Watch for loose clothing near agitator.
1.
Turn "
SPEED CONTROL
" to "
0
".
2.
Switch agitator to "
ON
".
3.
Push agitator "
START
" to initiate mixing.
4.
Turn "
SPEED CONTROL
" to desired mixing speed.
5.
To stop mixing action, push agitator
stop
button.
NOTE:
Mixing speed depends on the product consistency.
The faster the mixing speed the more damage may be done
to fragile product.
Emptying the Kettle
1.
To open automatic dump valve:
•
Turn PRODUCT DISCHARGE VALVE switch clockwise
to JOG TO OPEN. Release switch to the HOLD
position when desired valve opening is achieved.
•
To close valve, turn switch counterclockwise to
CLOSED position.
2.
To avoid splashing, slowly empty kettle contents into an
appropriate container by partially opening discharge
valve.
NOTE:
When pumping with a Metering Filling Station the
speed of the agitator arm must be sufficient to suspend the
heavier items in the mix in order to achieve an even
distribution in your packaged items.
3.
Immediately clean kettle as outlined in CLEANING
INSTRUCTIONS on page.
Summary of Contents for CLEVELAND HA-MKGL-100
Page 30: ...29 WIRING DIAGRAM 208 240V Page 1 of 2 Continued on page 2...
Page 31: ...30 WIRING DIAGRAM 208 240V Page 2 of 2 Continued from page 1...
Page 32: ...31 WIRING DIAGRAM 460 480V Page 1 of 2 Continued on page 2...
Page 33: ...32 WIRING DIAGRAM 460 480V Page 2 of 2 Continued from page 1...
Page 59: ...TILTING MODELS STATIONARY MODELS 58 PLUMBING ASSEMBLY WATER METER...