
BA 5010 EN 03.10
When the concrete has set, tighten the hexagon nuts of the stone bolts or
fastening bolts of the foundation blocks to the specified torque (see item 6.23).
The gear unit must not be excessively stressed when tensioning the hexagon
nuts or fastening bolts.
6.3.2.4 Mounting on a concrete foundation by means of anchor bolts
• Clean the undersurface of the gearunit base.
• Place support on the base plate in the fine grout.
• Insert anchor bolts.
• Place pressure plates in position and screw nuts on.
• Pack the anchor bolts with wood so that they are about 10 mm from the upper edge of the support
(see fig. 44).
4
6
5
2
3
1
7
8
1
Anchor bolt
2
Support
3
Base plate
4
Pressure plate
5
Hexagon nut
6
Wood
7
Finegrout concrete
8
Raw foundation
Fig. 44:
Anchor bolt
• Place gear unit on foundation.
Use only the eyes provided to attach lifting equipment to the unit.
Do not use the front threads at the shaft ends to attach slinging equipment for
the transport.
• Pull anchor bolts up (for this a bolt or threaded rod can be screwed into the thread on the front face).
• Fit washer.
• Unscrew hexagon nut a few turns by hand.
• Align gear unit with supports (see fig. 45).
─ The values punched into the screeds must always be observed.
─ Alignment tolerances in relation to the units on the input and output sides are to be in accordance with
the permissible angular and axial displacements of the couplings (see coupling drawings).
─ The alignment values must be recorded.
Summary of Contents for Warman 650 M200-MCR-G
Page 1: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 97: ...SUPLEMENTO M9 DEL MANUAL EMITIDO JUNIO DE 1998 7 Copyright WARMAN INTERNATIONAL LTD ...
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 243: ......
Page 244: ......
Page 274: ......