WeCo Srl Italia
www.wecobatteries.com
4K4 PRO V 1.11 28-9-2021
Step 2:
Next, install the pads on all four corners of the back of 1
st
module using the stack brackets in reverse position ( see
video on WeCo batteries Youtube Channel
https://www.youtube.com/watch?v=kzxuK2jWPK8&t=296s
)
Positioning the first module on a support in accordance with the local regulation and in accordance with the site specifications
Step 3: To lift and position the battery on top of the first one, use the temporary handles provided with the stack kit and align the second
battery with the first and lay down the second module.
Step 3.a: Lay the first module on a support in accordance with the local regulation and in accordance with the site
specifications