WeCo Srl Italia
www.wecobatteries.com
4K4 PRO V 1.11 28-9-2021
Wall Mounted Installation of Multiple Batteries
Keep 20 cm between the batteries and or between walls and other objects on the left and right side.
Maintain at least 40 cm from the ceiling.
The bottom side of the battery is suggested to be at 100cm from the floor for an easiest maintenance
Wall Stack Installation (Vertical Tower Kit) (Maximum Three Batteries per Stack)
Up to three batteries can be installed vertically, one on top of the other, against a wall with the bottom battery resting on the floor.
This installation will require the vertical installation kit (Vertical Kit) only available for use with the 4K4 batch WE-4K4P-21-30-0001.