WeCo Srl Italia
www.wecobatteries.com
4K4 PRO V 1.11 28-9-2021
Install the modules and secure it by using the bottom feet
INSTALL THE BUS BAS AND THE RS 485 RJ45 COMMUNICATION CABLE
INTERLOCK THE MODULES USING THE SUPPORT FEET INSTALLED ON EACH BATTERY
FIRST MODULE
( Floor Mounted)
RUBBER FEET
RUBBER FEET
SECOND MODULE
(Stack 1)
<
INSTALL THE BUS BAR ON THE LV
TERMINAL BLOCK